top of page

Our Recent Posts

Tags

Not cutting corners

  • Nov 2, 2018
  • 1 min read

After the concrete ground floor slab has been cast, the concrete gradually shrinks as it hardens. To control this process, the slab is cut into sections where controlled cracking can take place.

The circular saw has a petrol engine and wheels.

 Cut to the correct depth at locations specified by the Engineer.

For precise alignment, the tried and tested method of a stretched string. 


 
 
 

Comments


Hamilton Square, Livingston EH54 9JZ, UK

©2024 BY BARDEN DEVELOPMENT LTD.

bottom of page