Not cutting corners
- Nov 2, 2018
- 1 min read
After the concrete ground floor slab has been cast, the concrete gradually shrinks as it hardens. To control this process, the slab is cut into sections where controlled cracking can take place.

The circular saw has a petrol engine and wheels.

Cut to the correct depth at locations specified by the Engineer.

For precise alignment, the tried and tested method of a stretched string.







Comments