What lies beneath

  • Feb 14, 2019
  • 1 min read

The utilities have been busy bringing the services into Barden House through the trenches that have been dug around the site. 

Colour coding for the archaeologist in the future: gas mains (yellow), street lighting (corrugated red), BT (far right grey), Virgin fibre cable duct (green), mains electricity (black) with our supply due to be connected (hard red duct). We will need a new silicon sealed lozenge to protect from water ingress. 

New sealed lozenge for electricity connection. 

High capacity hydrant line running along the south side of the building. 

Water main with cut off valve running into the building.


 
 
 